Preprocessing Checklist
Before running batches, make sure the following are in place:
Required permissions are assigned to run batch jobs
Document template is ready with the necessary business logics and is tested with sample data
Input data readiness - batch input files are available at the configured input path or source and the file format (CSV, TXT, XML, or database input) matches the expected schema
The target environment (QA, UAT, or Production) is set up and ready to use.
FGT Configuration
Required output filters (PDF, AFP, HTML, PS) are added as plugins,
FGTs are created for File Level, Level1, and Level2, as needed, and
An accessible output path
Client and Channel Configuration
Primary and Dependent clients are registered in UniServe 360.
Required channels (Print, Email, SMS, WhatsApp, or Direct Print) are configured.
Indexing
Job schemas for primary and dependent clients are available.
Custom fields are mapped using global Data Variables, if required.